Train Rescue Down Under
S01E04 Getting A Cane Loco Back To Harvest
A locomotive requires a double bogie replacement to return to the sugarcane harvest, while traction motors from the mining trains are undergoing repairs. Additionally, the pressure is mounting for a challenging air conditioner swap.
Season 1 Episodes
1
2
3
4
5
6
7
8
9
10
All Aboard An Australian Icon
Getting a Freight Train to the Finish Line
High Stakes Engine Rebuild
Getting A Cane Loco Back To Harvest
One Day Mission To Replace Freight Engine
Single Day Traction Motor Challenge
High Precision Gear Box Overhaul
Rusty Water Tank Cut Off Steam Loco
Loco Maintenance Team Expect The Unexpected
The Heat is on to Crane in a Rooftop